2003 Chrysler Voyager Base, 2.4 BFACTORY OEM SERVICE PROCEDURE

Integrated Power Module: Installation

  1. Snap the left side of the Integrated Power Module (IPM) housing in its mounting bracket and connect the various electrical connectors. Care must be taken that the Connector Positive Assurance (CPA) on the five-pin B+ connector is positively engaged to prevent generating a Diagnostic Trouble Code (DTC).
    Fig 1: Disconnecting IPM
    G03439226Courtesy of DAIMLERCHRYSLER CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.