2002 Chrysler Neon LE, AutomaticFACTORY OEM SERVICE PROCEDURE

Radiator Fan: Installation

  1. Install radiator fan assembly by lowering into position on radiator. Ensure the fan assembly lower mounts are engaged properly into slots on lower radiator tank. (Figure or Figure ).
  2. Install the radiator fan assembly retaining screws and tighten to 7.5 N.m (65 in. lbs.). (Figure).
  3. Install radiator upper support mounts and tighten bolts to 10 N.m (90 in. lbs.) (Figure).
  4. Install air conditioning line support bracket screw. (Figure).
  5. Raise vehicle on hoist.
  6. Connect radiator fan electrical connector. (Figure).
  7. Install powertrain control module (PCM).
  8. Lower vehicle.
  9. Install air cleaner housing fasteners.
  10. Install radiator upper hose to radiator. (Figure). Align hose and position clamp to ensure proper clearance with engine or hood.
  11. Fill cooling system. Refer to STANDARD PROCEDUREΒ .
  12. Connect negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.