2002 Chrysler Intrepid BaseFACTORY OEM SERVICE PROCEDURE

Installation - 3.5L

  1. Install generator.
  2. Install the pivot bolt.
  3. Install the lower mounting bolt.
  4. Connect the B+ wire and tighten nut and tighten to 9.8 N.m (85 +/- 15 in. lbs.).
  5. Connect the generator field circuit connector.
  6. Install generator drive belt. Refer to GENERATOR/POWER STEERING BELT .
  7. Tighten the pivot bolt.
  8. Tighten the lower mounting bolt.
  9. Install the upper radiator support and tighten bolts.
  10. Connect the negative battery cable. Tighten all fasteners to the proper torque. Refer to the Torque Specifications chart in this section.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.