2001 Chrysler PT Cruiser Base, AutomaticFACTORY OEM SERVICE PROCEDURE

Liftgate Indicator Inoperative

  1. Disconnect Black 2-pin liftgate ajar switch connector, located in center of liftgate. Using a jumper wire, connect harness connector terminal No. 1 (Tan/Black wire) to ground. Using scan tool, select BODY, ELECTRO/MECH CLUSTER and INPUT/OUTPUT. LIFTGATE AJAR SW state should be CLOSED. If switch state is not closed, go to next step. If switch state is closed, replace liftgate ajar switch. After repair, perform BODY VERIFICATION TESTΒ  under VERIFICATION TESTS.
  2. Remove jumper wire. Using ohmmeter, check resistance between harness connector terminal No. 2 (Black wire) and ground. If resistance is 5 ohms or more, repair open or poor connection on Black wire to ground, located on left quarter panel, below window. If resistance is less than 5 ohms, replace instrument cluster. See ANALOG INSTRUMENT PANELS - PT CRUISER article. After repair, perform BODY VERIFICATION TESTΒ  under VERIFICATION TESTS.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.