2001 Chrysler Neon LE, AutomaticFACTORY OEM SERVICE PROCEDURE

Checking PCM Power & Ground Circuits

NOTE: After making any repairs, perform POWERTRAIN VERIFICATION TESTΒ  under VERIFICATION TESTS.
  1. Turn ignition off. Disconnect 40-pin Powertrain Control Module (PCM) C1 and C2 connectors. Using a 12-volt test light connected to ground, probe PCM harness connector C2 terminal No. 42, fused B+ circuit (Red/White wire). If test light illuminates, go to next step. If test light does not illuminate, repair fused B+ circuit. See POWER DISTRIBUTION article in WIRING DIAGRAMS.
  2. Turn ignition on. Using a 12-volt test light connected to ground, probe PCM harness connector C1 terminal No. 20, fused ignition start/run circuit (Dark Blue/White wire). If test light illuminates, go to next step. If test light does not illuminate, repair fused ignition start/run circuit. See POWER DISTRIBUTION article in WIRING DIAGRAMS.
  3. Turn ignition off. Using a 12-volt test light connected to battery voltage, probe ground circuits at PCM harness connector C1 terminal No. 47 (Black/White wire) and PCM harness connector C2 terminals No. 10 and 50 (Black/Tan wires). If test light illuminates, test is complete. If test light does not illuminate, repair ground circuit(s). See GROUND DISTRIBUTION article in WIRING DIAGRAMS.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.