1997 Chrysler LHSFACTORY OEM SERVICE PROCEDURE

Pinion Factor Procedure

WARNING: This page does not describe the selected car, but rather 42 other vehicles, including the 1996 Plymouth Voyager, 1996 Plymouth Neon, 1996 Plymouth Grand Voyager, 1996 Plymouth Breeze, and 1996 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
  1. Pinion factor procedure must be performed if Transaxle Control Module (TCM) is replaced or changed from one vehicle to another. Procedure must be used to calibrate TCM for different equipment combinations to provide speedometer operation and correct readings. Failure to perform this procedure will result in no speedometer operation.
    NOTE: It may be necessary to consult manufacturer to determine Final Drive Ration (FDR) number when performing pinion factor procedure.
  2. Connect DRB to data link connector, located near brake pedal at bottom of instrument panel. Using proper cartridge and DRB manufacture's instructions, move through program to enter 41TE/AE menu. Select ADJUSTMENTS function.
  3. Select PINION FACTOR function. Select appropriate Final Drive Ratio (FDR) number and then the tire size. Remove DRB. Road test vehicle and verify speedometer operation.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.