1997 Chrysler LHSFACTORY OEM SERVICE PROCEDURE

Starter Relay Test

NOTE: Perform SOLENOID CIRCUIT TESTΒ  before testing starter relay.

Remove starter relay from Power Distribution Center (PDC). Refer to PDC cover for proper relay location. PDC is located in engine compartment. Connect 12-volt power source to starter relay terminal No. 86 and ground terminal No. 85. See Fig 1. Using ohmmeter, check continuity across starter relay terminals No. 30 and 87. If continuity is not present, replace starter relay.

Fig 1: Identifying Starter Relay Terminals
G95F35282Courtesy of CHRYSLER CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.