1997 Chrysler LHSFACTORY OEM SERVICE PROCEDURE

Cranking Test

NOTE: Ensure engine is at normal operating temperature. High viscosity oil, extreme cold temperatures, or tight engine will increase amperage draw.
  1. Using a battery load tester, connect positive and negative leads to battery. Connect inductive ammeter pick-up to positive battery cable. Disable ignition and fuel systems. See DISABLING/ENABLING IGNITION & FUEL SYSTEMSΒ .
  2. Ensure all lights and accessories are off. Place A/T in Park position or M/T in Neutral position. Apply parking brake. Crank engine and observe voltmeter reading. If voltage is more than 9.6 volts and cranking amperage draw is more than specified amps, proceed to CIRCUIT RESISTANCE TESTS. See STARTER SPECIFICATIONSΒ .
  3. If voltage is 12.5 volts or more and cranking amperage draw is less than specified, check starter circuit components in the following order: starter solenoid, starter relay, starter relay circuit, park/neutral position switch or transmission range sensor (A/T), clutch pedal position switch (M/T), ignition switch, wiring harness and connections.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.