Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
1996 Chrysler Sebring LXiFACTORY OEM SERVICE PROCEDURE
Ignition Power Transistor
- Turn ignition off. Disconnect 6-pin power transistor connector. Disconnect 2-pin distributor connector. Using a jumper wire, connect negative terminal of a 1.5 volt battery to 6-pin power transistor connector terminal No. 5 (Black wire).
- Using another jumper wire, connect positive terminal of 1.5 volt battery to 6-pin power transistor connector terminal No. 6 (Red/Green wire). Using an analog ohmmeter, check for continuity between 6-pin power transistor connector terminal No. 5 (Black wire) and 2-pin distributor connector terminal No. 12. See Fig 1 .
- With 1.5 volts applied, continuity should be present. Disconnect 1.5 volts from 6-pin power transistor connector. With voltage removed, continuity should not be present. If continuity is as specified, power transistor is okay. If continuity is not as specified, replace power transistor. Power transistor is located inside distributor.
Factory Service Tools
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- β’ You smell fuel, burning insulation, or see smoke.
- β’ Brakes feel soft, pull hard to one side, or make grinding noises.
- β’ The engine overheats, stalls repeatedly, or misfires under load.
- β’ You are missing required tools, torque specs, or safe lifting equipment.
- β’ You are not confident in the next step or safety outcome.
