1995 Chrysler Sebring LXiFACTORY OEM SERVICE PROCEDURE

Coil Resistance Test

Measure primary coil resistance at the 2-pin distributor connector. Resistance should be 0.6-0.8 ohms. Measure secondary coil resistance between the coil tower and each terminal of the 2-pin distributor connector. Resistance should be 12,000-18,000 ohms.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.