1995 Chrysler Sebring LXiFACTORY OEM SERVICE PROCEDURE

Stoplight Switch Circuit

  1. Check if stoplights are operating normally. If stoplights are operating normally, go to step 3). If stoplights are not operating normally, go to next step.
  2. Ensure stoplight switch is installed and adjusted correctly. See the BRAKE SYSTEM article. Repair or replace as necessary. If stoplight switch is okay, check Red/Black and Green wires between ABS-ECU and fuse No. 1. Repair as necessary.
  3. Disconnect ABS-ECU connector. Ensure stoplights are illuminated. Using a voltmeter, check for voltage between ground and ABS-ECU wiring harness connector terminal No. 29. See Figure . If battery voltage exists, go to step 5). If battery voltage does not exist, go to next step.
  4. Inspect connectors between ABS-ECU and fuse No. 1. Clean or repair as necessary. Verify if DTC still exists. If DTC still exists, check Red/Black and Green wires between ABS-ECU and fuse No. 1. Repair as necessary.
  5. Inspect ABS-ECU connector. Clean or repair as necessary.Verify if DTC still exists. If DTC still exists, replace ABS-ECU.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.