1995 Chrysler LeBaronFACTORY OEM SERVICE PROCEDURE

Modulator Assembly: Installation

  1. Check 3 modulator assembly bushings and replace if necessary. See Fig 1. Install modulator assembly on mounting bracket. Ensure bushings are properly aligned on mounting bracket and modulator assembly. Install, but DO NOT tighten, modulator assembly-to-bracket bolt. Raise vehicle on hoist. Install and tighten both lower mounting bracket bolts to 21 ft. lbs. (28 N.m).
  2. Reconnect 10-pin modulator assembly connector. Lower vehicle. Tighten modulator-to-bracket upper bolt to 21 ft. lbs. (28 N.m). Install 6 hydraulic brake tubes to modulator assembly, and tighten fittings to 13 ft. lbs. (18 N.m).
  3. Bleed brake system. See BLEEDING BRAKE SYSTEM. Install acid shield and battery tray. Install battery, and connect battery cables.
Fig 1: Locating Modulator Assembly Mounting Bushings
G93B41260Courtesy of CHRYSLER CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.