1983 Chrysler ImperialFACTORY OEM SERVICE PROCEDURE

Preliminary Check

  1. Connect tachometer and adjustable timing light to engine. Start engine and allow to idle. Idle speed should be between 530-630 RPM. If not, adjust idle speed using EFI tester.
  2. Ground closed throttle switch using jumper wire. Timing light should indicate 12Β° BTDC. If not, adjust basic timing. Raise engine RPM to 1500 RPM with switch still grounded. If timing changes, CCC must be replaced. If timing does not change, go to next step.
  3. Remove jumper wire from closed throttle switch and decrease engine speed to 1000 RPM. Timing should be 27-35Β°. If not, replace CCC. If so, go to next step.
  4. Increase engine speed to 2000 RPM. Timing should be 47-55Β°. If not, replace CCC. If so, engine has passed preliminary test. Other testing must be done with EFI tester.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.