2025 Chevrolet Trailblazer RS, 4WDFACTORY OEM SERVICE PROCEDURE

Video Processing Module Replacement

GM5395296Courtesy of GENERAL MOTORS COMPANY
Callout Component Name
Preliminary Procedure 
Quarter Lower Rear Trim Panel Replacement - Left Side
1 Video Processing Module Nut [2x]
Tighten 
9 N.m (80 lb in)
2 Video Processing Module

Procedure

  1. Disconnect the electrical connectors.
  2. Perform the necessary programming and setup procedure: Control Module References
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.