2017 Chevrolet Volt PremierFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    Fig 1: Front Floor Console Accessory Bracket, Wireless Charging System Module And Bracket Bolts
    GM4137993Courtesy of GENERAL MOTORS COMPANY
  1. Assemble the Front Floor Console Accessory Bracket (2) to the Wireless Charging System Module (3).
  2. Install Front Floor Console Bracket Bolt (1) and tighten 1 N.m (9 lb in)
  3. Fig 2: Front Floor Console Housing Assembly And Radio Cooling Duct
    GM4137992Courtesy of GENERAL MOTORS COMPANY
  4. Connect the Front Floor Console Housing Assembly (1) to the Radio Cooling Duct (2).
  5. Connect the electrical connector.
  6. Fig 3: Front Floor Console Bracket Bolts
    GM4137991Courtesy of GENERAL MOTORS COMPANY
  7. Install Front Floor Console Bracket Bolt (1) and tighten 2.5 N.m (22 lb in)
  8. Install Front Floor Rear Console Side Trim Panel Replacement - Right Side
  9. Install Front Floor Rear Console Side Trim Panel Replacement - Left Side
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.