2016 Chevrolet Volt PremierFACTORY OEM SERVICE PROCEDURE

Installation Procedure

  1. Clean the intake manifold mating surfaces (2).
  2. Fig 1: Gasket And Intake Manifold
    GM4091035Courtesy of GENERAL MOTORS COMPANY
  3. Install the NEW gasket (1).
  4. Fig 2: Throttle Body, Electrical Connector And Bolts
    GM4091036Courtesy of GENERAL MOTORS COMPANY
  5. Install Throttle Body (3)
  6. CAUTION:

    Refer to Fastener Caution

  7. Install and tighten Bolts (1) (Qty: 4) @ Throttle Body to 10 N.m (89 lb in)
  8. Connect Electrical Connector (2) @ Throttle Body
  9. Install Air Cleaner Outlet Duct. Refer to Air Cleaner Outlet Duct ReplacementΒ 
  10. Install Dash Upper Extension Panel Opening Cover. Refer to Dash Upper Extension Panel Opening Cover Replacement
  11. Enable High Voltage System. Refer to High Voltage Enabling
  12. Perform the throttle learn procedure. Refer to Throttle or Idle LearnΒ 
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.