2011 Chevrolet VoltFACTORY OEM SERVICE PROCEDURE

Drive Motor Battery Charger Receptacle Replacement

Fig 1: Drive Motor Battery Charger Receptacle
GM2396972Courtesy of GENERAL MOTORS CORP.
Callout Component Name

Preliminary Procedures

  1. Disable the high voltage system. Refer to High Voltage Disabling .
  2. Remove the charge port housing. Refer to Charge Port Housing ReplacementΒ .
1 Drive Motor Battery Charger Receptacle Fastener (Qty: 4)
CAUTION: Refer to Fastener Caution .

Tighten:Β  12 N.m (106 lb in)

2 Drive Motor Battery Charger Receptacle Fastener

Procedure

  1. Disconnect the electrical connector.
  2. Enable the high voltage system. Refer to High Voltage Enabling .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.