2007 Chevrolet Uplander V6-3.9LFACTORY OEM SERVICE PROCEDURE

HVAC Control Module Replacement



HVAC Control Module Replacement

Removal Procedure

Factory service manual diagram



1. Remove the instrument panel (I/P) accessory trim plate.
2. Remove the HVAC control module bolts/screws.
3. Pull the HVAC control module straight out from the I/P.
4. Disconnect the HVAC control module electrical connectors.

Installation Procedure

Factory service manual diagram



1. Connect the HVAC control module electrical connectors.
2. Install the HVAC control module into the I/P opening.

Notice: Refer to Fastener Notice.

3. Install the HVAC control module bolts/screws.

Tighten the bolts/screws to 2.5 N.m (22 lb in).

4. Install the I/P accessory trim plate.
5. Re-calibrate the actuators. Refer to Actuators Recalibration. Programming and Relearning
6. Refer to Programming and Relearning. Programming and Relearning
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.