2007 Chevrolet HHR L4-2.2LFACTORY OEM SERVICE PROCEDURE

Data Link Connector: Service and Repair



DATA LINK CONNECTOR REPLACEMENT

REMOVAL PROCEDURE
1. Lower the instrument panel (I/P) closeout panel. Refer to Instrument Panel Insulator Replacement.

Factory service manual diagram



2. Remove the screws securing the data link connector (DLC) to the I/P carrier.

INSTALLATION PROCEDURE

Factory service manual diagram





1. NOTE: Refer to Fastener Notice.

Install the screws securing the DLC to the I/P carrier.

Tighten the screws to 2 N.m (18 lb in).

2. Install the I/P closeout panel.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.