2003 Chevrolet SSR BaseFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
  1. Install electrical connections to PCM.

    Tighten:Β  Tighten bolts to 10 N.m (89 lb in).

  2. Install the PCM to the bracket.
  3. Position PCM water boot back into place.
  4. Close the hood.
  5. Connect negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.
  6. If the PCM was replaced, the replacement PCM must be programmed. Refer to Service Programming System (SPS) (Remote Procedure) or Service Programming System (SPS) (Pass-Thru Procedure) or Service Programming System (SPS) (Off Board Remote Procedure) or Service Programming System (SPS) (Off Board Pass-Thru Procedure) in Programming.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.