2002 Chevrolet Venture PlusFACTORY OEM SERVICE PROCEDURE

Installation Procedure

  1. Install the generator to the vehicle and position the generator above the drive axle.
  2. Install electrical harness to retainer on right fender well.
  3. Install the power steering pump to the engine. Refer to POWER STEERING PUMP REPLACEMENT .
  4. Install the fuel pressure test port (Schrader valve) cap to the fuel injector rail.
  5. Install the power steering pipes from the power steering pipe retainer.
  6. Install the generator bracket. Refer to Generator Bracket ReplacementΒ .
  7. Install the drive belt tensioner. Refer to DRIVE BELT TENSIONER REPLACEMENT .
    Fig 1: Installing Fuel Pressure Test Port (Schrader Valve) Cap
    G01829764Courtesy of GENERAL MOTORS CORP.
  8. Install the generator to the generator bracket and position the generator above the drive axle.
  9. Install the drive belt tensioner. Refer to DRIVE BELT TENSIONER REPLACEMENT .
  10. Install the generator to the generator bracket.
  11. Install the generator front bolt.
    Fig 2: Installing Generator Front Bolts
    G01829765Courtesy of GENERAL MOTORS CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.