1998 Chevrolet Metro BaseFACTORY OEM SERVICE PROCEDURE

System Self-Test (Initialization)

The initialization is a 2-step process. It starts when ignition switch is first turned to ON position.

  1. During the first part of the initialization, the EBCM will verify ABS relay operation. Also, the EBCM commands the ABS and ABS ACTIVE indicator lights ON for about 2-3 seconds. The Red BRAKE warning indicator light is briefly flashed ON.
  2. The second part of this process starts when the vehicle reaches 3 MPH. During this process, the EBCM will verify motor, hydraulic modulator and solenoids by using specific control schemes to verify all components are functioning properly. A slight mechanical noise may be heard during the system initialization, which is normal. If your foot is on the brake pedal during this process, a slight movement in the pedal may be felt.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.