1990 Chevrolet APVFACTORY OEM SERVICE PROCEDURE

Injection Pump: Installation

  1. Install new injection pump gasket. Align locating pin on injection pump hub with slot in injection pump driven gear. At the same time, align injection pump timing marks. Cylinder No. 1 must be set at TDC. See Figure.
  2. Attach injection pump to front cover. Alignment marks made during removal must be aligned. Tighten nuts. Attach pump to drive gear and tighten bolts. Reverse removal procedure to complete installation. Check injection pump timing. See INJECTION PUMP TIMING in ADJUSTMENTS article.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.