1976 Chevrolet Chevette Base, Standard TransFACTORY OEM SERVICE PROCEDURE

System Test

  1. Check that all in-line fuses or circuit breakers are operational and supply power. With control switch turned "ON", measure voltage of Purple wire at rear window grids. There should be approximately 12-13 volts, if not check wiring harness, control switch or relay timer.
  2. Connect negative lead of voltmeter to ground. At midpoint of grid lines voltage should be approximately six volts. If voltage is 12-13 volts, there is a break between midpoint and ground. If voltage is zero, there is a break between midpoint and input side of grid lines.
  3. Disconnect switch leads and check that it is switching properly. If switch is operating normally, install a new relay timer and check operation of system. If system now operates normally, replace relay timer.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.