1976 Chevrolet Chevette Base, Standard TransFACTORY OEM SERVICE PROCEDURE

Window Motor

Disconnect harness connector at motor. Using a 12 volt power source, connect positive power source lead to one of motor terminals and ground other lead. Motor should operate. To check reverse rotation of motor, switch positive lead to other terminal. If motor does not operate in either direction, motor is defective.

Fig 1: G.M. Power Tailgate Wiring Diagram
G09323631Courtesy of GENERAL MOTORS COMPANY
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.