2004 Cadillac SevilleFACTORY OEM SERVICE PROCEDURE

Installation Procedure

    Fig 1: Identifying Generator Bolts
    GM780404Courtesy of GENERAL MOTORS CORP.
  1. Position the generator to the A/C compressor and engine.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the generator mounting bolts (1, 2).

    Tighten:Β  Tighten the generator mounting bolts to 50 N.m (37 lb ft).

  4. Fig 2: Vie of Generator Output BAT Terminal Protective Boot
    GM780408Courtesy of GENERAL MOTORS CORP.
  5. Connect the wiring harness connector to the generator.
  6. Connect the battery positive lead and install the generator output BAT terminal nut.

    Tighten:Β  Tighten the generator output BAT terminal nut to 12.5 N.m (111 lb in).

  7. Press the protective boot on to the generator output BAT terminal.
  8. Install the engine cooling fans. Refer to Cooling Fan Replacement - Electric in Engine Cooling.
  9. Install the drive belt. Refer to Drive Belt Replacement in Engine Mechanical-4.6L.
  10. Connect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect ProcedureΒ .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.