2012 Buick Regal BaseFACTORY OEM SERVICE PROCEDURE

Secondary Air Injection Pipe Replacement

Fig 1: Identifying Secondary Air Injection Pipe Replacement & Bolts
GM2094022Courtesy of GENERAL MOTORS COMPANY
Secondary Air Injection Pipe Replacement

Callout Component Name
Preliminary Procedure 
Remove the secondary air injection check valve. Refer to Secondary Air Injection Check Valve Replacement 
1 Secondary Air Injection Pipe Bolt (Qty: 4)
CAUTION:

Refer to Fastener Caution .


Tighten 
10 N.m(89 lb in).
2 Secondary Air Injection Pipe
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.