2009 Buick Allure CXFACTORY OEM SERVICE PROCEDURE

Circuit/System Testing

  1. Ignition OFF, disconnect the X-1 harness connector at the BCM.
  2. Verify that there is less than a 2 volt difference between the battery positive voltage circuit terminal 51 and the ground circuit terminal 19, and between the battery positive voltage circuit terminal 52 and the ground circuit terminal 17.
    • If greater than the specified range, test the voltage circuits for a short to ground or open/high resistance, and the ground circuits for open/high resistance.
  3. If the circuits test normal, replace the BCM.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.