2005 Buick Park Avenue BaseFACTORY OEM SERVICE PROCEDURE

Removal Procedure

    Fig 1: Removing/Installing Boost Control Solenoid Electrical Connector
    GM66405Courtesy of GENERAL MOTORS CORP.
  1. Remove the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement (L36) or Fuel Injector Sight Shield Replacement (L67) in Engine Mechanical.
  2. Disconnect the boost source and signal hoses from the boost control solenoid (2).
  3. Disconnect the boost control solenoid electrical connector.
  4. Remove the boost control solenoid retaining nut.
  5. Fig 2: Removing/Installing Boost Control Solenoid
    GM66407Courtesy of GENERAL MOTORS CORP.
  6. Remove the boost control solenoid (2).
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.