1995 Buick Park Avenue BaseFACTORY OEM SERVICE PROCEDURE

Circuit Description

Under most conditions, PCM commands boost control solenoid to operate at a 100 percent duty cycle (on) to allow full intake boost pressure upon demand. However, if reverse gear is selected, PCM detects rapid deceleration or engine load is extremely high, reduced boost is desired. Under these conditions, PCM commands boost control solenoid to operate at a zero percent duty cycle (off), which opens by-pass valve to reduce boost pressure by recirculating it back through supercharger inlet.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.