1985 BMW 524tdFACTORY OEM SERVICE PROCEDURE

Injection Pump Linkage

  1. Start and run engine until normal operating temperature is reached. Stop engine. Measure and record distance between pump lever and pump rear bracket (dimension "A"). Move lever against high speed stop screw.
  2. Again, measure and record distance between pump lever and pump rear bracket (dimension "B"). Subtract dimension "A" from dimension "B". The difference will be referred to as distance dimension "Y".
  3. Convert dimension "Y" to dimension "C". See INJECTION PUMP OPERATING LEVER ADJUSTMENTΒ  table. Record dimension "C". Remove linkage between throttle lever and transmission kickdown. Measure distance between throttle lever ball joint and lever pivot nut (dimension "D").
  4. Dimension "D" should equal dimension "C". If dimension "C" and "D" are not equal, loosen nut on bottom of lever ball joint. Move ball joint in or out to make distance "D" equal with distance "C". Tighten ball joint nut. See Fig 1.
    Fig 1: Adjusting Throttle Linkage Dimensions A, B & C
    G35569
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.