1995 Audi 90S, CS V6-2.8L (AFC)FACTORY OEM SERVICE PROCEDURE

Data Link Connector: Testing and Inspection

PROCEDURE
- Check for voltage supply at Data Link Connector (DLC) A (Black) in vehicle, observe polarity while performing this check:
^ Terminal 1 goes to Battery negative (-)
^ Terminal 2 goes to Battery positive (+) (fuse 19)

- If battery voltage is not obtained, check wiring using wiring diagram, repair or replace as necessary.

- Check wiring for continuity between ECM and DLC.

DLC connector B (White)
^ Terminal 1 goes to C 13 of the ECM
^ Terminal 2 goes to C 12 of the ECM

DLC connector C (Blue)
^ Terminal 2 goes to C 14 of the ECM

- If there is no continuity, check wiring using wiring diagram, repair or replace as necessary.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.