1991 Audi 100 BaseFACTORY OEM SERVICE PROCEDURE

Ignition Coil Resistance Check

  1. Using ohmmeter, check ignition coil primary and secondary resistance. Disconnect coil primary and secondary ignition leads. Connect ohmmeter leads across primary terminals No. 1 and No. 15 at coil. See Figure . Resistance value should be .5-1.5 ohms.
  2. Connect ohmmeter leads between positive terminal No. 1 and coil high voltage tower. See Figure . Secondary resistance value should be 5000-9000 ohms. If resistance values are not as specified, replace ignition coil.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.