2012 Acura ZDXFACTORY OEM SERVICE PROCEDURE

Motor Test

  1. Remove the front passenger's door panel (see FRONT DOOR PANEL REMOVAL/INSTALLATION ).
  2. At the front passenger's door wire harness 28P connector, test the front passenger's power window motor in each direction by connecting battery power and ground according to the table. When the motor stops running, disconnect one lead immediately.
    Fig 1: Battery Power And Ground Connection Chart
    G08076882Courtesy of AMERICAN HONDA MOTOR CO., INC.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.