2012 Acura TL BaseFACTORY OEM SERVICE PROCEDURE

PCV Valve Replacement

  1. Lift up the harness cover (A).
    Fig 1: Harness Cover, Bolt And PCV Valve With Torque Specifications
    G08069871Courtesy of AMERICAN HONDA MOTOR CO., INC.
  2. Remove the bolt (B).
  3. Remove the PCV valve (C).
    NOTE: Do not to spill oil on the hot exhaust manifold.
  4. Install the parts in the reverse order of removal.
NOTE:
  • When installing a new PCV valve, make sure the O-rings (D) are in place.
  • When installing a used PCV valve, use new O-rings.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.