1999 Acura Integra GS-R, 2D CoupeFACTORY OEM SERVICE PROCEDURE

Cranking Test

  1. Connect a voltmeter and ammeter to battery. See Fig 1 . On Integra, remove fuse No. 44 (15-amp) from underhood fuse/relay box. On 3.2TL, remove FUEL PUMP fuse (15-amp) from driver's underdash fuse/relay box. On 3.5RL, disconnect 8-pin and 6-pin connectors from ignition control module. Ignition control module is located on right strut tower. On SLX, disconnect two 3-pin connectors and one 4-pin connector from ignition control module. Ignition control module is located on rear of intake manifold.
  2. Turn ignition switch to START position. Engine should crank without starting. Check cranking voltage and current draw. Ensure voltage is at least 8 volts. Current draw should be less than 350 amps. Cranking speed should be above 100 RPM.
Fig 1: Connecting Voltmeter & Ammeter For Cranking Test
G99B50014Courtesy of AMERICAN HONDA MOTOR CO., INC.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.