1997 Acura 2.2CL AutomaticFACTORY OEM SERVICE PROCEDURE

Power Window Key-Off Timer Test

NOTE: Some wires have been assigned a superscript to distinguish them from other wires of the same color. For example, the Yellow/Green(1) wire is not the same as the Yellow/Green(2) wire.

Remove integrated control unit from underdash fuse/relay box. Test each circuit of integrated control unit connector for continuity or voltage as indicated. See Fig 1 . Correct any problems found. If no problems are found, replace integrated control unit.

Fig 1: Testing Power Window Key-Off Timer
G97E11449Courtesy of AMERICAN HONDA MOTOR CO., INC.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.