1995 Acura Integra (GS-R) L4-1797cc 1.8L DOHC (VTEC)FACTORY OEM SERVICE PROCEDURE

Replacement

Replacement
1. Disconnect the air mix control cable from the heater unit.
2. Remove the rear window defogger switch and the hazard warning switch.

Factory service manual diagram




3. Remove the two self-tapping screws, then pull out the heater control panel and the center air vent. Disconnect the connectors, and remove the heater control panel and the center air vent.

NOTE: The locking tabs of the hazard warning switch and heater control panel connectors are on the bottom.

Factory service manual diagram




4. Remove the four self-tapping screws and the center air vent.
5. Install in the reverse order of removal, and adjust the air mix control cable at the heater unit. If necessary, adjust the heater valve cable.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.