1993 Acura Integra GS-RFACTORY OEM SERVICE PROCEDURE

Valve Guide Installation

WARNING: This page is about a different variant/trim than selected.
  1. Cool new valve guides in freezer for about one hour. Remove new valve guides from freezer as needed. Install new valve guides from camshaft side of cylinder head.
  2. Drive each guide into heated head until attachment bottoms against head. If replacing all valve guides, reheat cylinder head as necessary.
  3. Intake valve guide installed height must be 0.55" (14 mm). Exhaust valve guide installed height must be 0.63" (16 mm). Using cutting oil, ream new valve guides by rotating Valve Guide Reamer (07984-657010C) clockwise the full length of valve guide bore. Measure valve stem oil clearance. See CYLINDER HEAD table under ENGINE SPECIFICATIONS.
NOTE: Always reface valve seat after replacing valve guide.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.