1993 Acura Integra GS-RFACTORY OEM SERVICE PROCEDURE

Removal & Installation: Solenoid: Installation

  1. Fill modulator body with clean brake fluid up to step in solenoid mounting hole. Coat new solenoid "O" rings with clean brake fluid, and install "O" rings on solenoid. Apply thin film of clean brake fluid to solenoid body and "O" rings. Position solenoid on set plate.
  2. Ensure mark on set plate matches mark on solenoid. Align solenoid projection with cutout in set plate and turn valves 1/2 turn. Install solenoid adjust springs in modulator body. Install set plate bolt removed in step 3) of REMOVAL procedure. Tighten all set plate bolts to 11 ft. lbs. (15 N.m). Install reservoir and filter.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.