1992 Acura Integra GS-RFACTORY OEM SERVICE PROCEDURE

Switch Inputs Test

Turn ignition off. Remove driver's door panel. Unplug connectors from master switch. Using a DVOM, perform switch input tests in Fig 1 . If all input test results are okay, inspect connector and terminals for damage and proper fit. If connector is okay and power windows still malfunction, replace master switch.

Fig 1: Switch Inputs Test
G93E82549Courtesy of AMERICAN HONDA MOTOR CO., INC.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.