1992 Acura Integra GS, 2D Hatchback, StandardFACTORY OEM SERVICE PROCEDURE

Starter Signal

Connect PGM-FI test harness between ECU and vehicle harness. Measure voltage on PGM-FI test harness terminals B9 (positive) and A26 (negative) with ignition switch in START position. If battery voltage is present, starter signal is okay. If voltage is not present, inspect fuse No. 18. If fuse is okay, repair open in Blue/White wire between ECU and fuse No. 18.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.